Texas RRC as reported
Permits, operators, and asset signals come from public regulatory publications. Source data can be delayed, incomplete, amended, or wrong. We show what we ingested — including when GIS is missing.
Trust
Primary source: the Texas RRC (Railroad Commission of Texas).
Permits, operators, and asset signals come from public regulatory publications. Source data can be delayed, incomplete, amended, or wrong. We show what we ingested — including when GIS is missing.
Each permit event keeps a first-seen origin: publisher, file, checksum, URI. Re-ingest does not overwrite that snapshot. Identity is permit-seq (permit + sequence), because amendments are real.
Briefs and digest narrative may be model-written. Numeric claims are supposed to come from structured rows, with source IDs attached. Still verify material facts before a high-stakes call. We do not market “SOTA ML.”
Oil production is often lease-level, not well-level. Idle and orphan lists follow the public definition we ingested. Scores and “hot” labels are OFS Radar products — not official determinations.
Data as reported by the Texas RRC. Not affiliated with the Railroad Commission of Texas. Not a legal or regulatory record.
Questions on a specific row: [email protected]. A public ingest-lag dashboard ships after the paid desk is live.
Next step
Request a 14-day Texas Permits trial, or start with the delayed weekly RRC brief.